PARTICIPATING IN THE SMART2 PROJECT WITHIN THE SHIFT2RAIL INNOVATION PROGRAMME 5

PARTICIPATING IN THE SMART2 PROJECT WITHIN THE SHIFT2RAIL INNOVATION PROGRAMME 5

PARTICIPATING IN THE SMART2 PROJECT WITHIN THE SHIFT2RAIL INNOVATION PROGRAMME 5 150 150 Marjan Dimec

FOKUS TECH participates in the SMART2 project within the Shift2Rail Innovation Programme 5. SMART2 project will build on the results achieved in project SMART by advancement, innovation and implementation of SMART2 on-board long-range all-weather obstacle detection (OD) and track intrusion detection (TID) system. Two new systems will be also researched, innovate and developed: advanced SMART2 trackside (TS) /airborne OD&TID system. All three systems will be integrated into a holistic OD&TID system via interfaces to central Decision Support System (DSS). Project duration: 1 December 2019 to 30 November 2022.